01 Ground
We start with the soil, not the skyline.
Before a single pile is driven we map water, wind and the species already living on the plot. The masterplan bends around them.
Eco-city developer · est. 2014
Skybloom builds glass-and-timber districts where every tower carries its own garden. Scroll to watch one rise.
01 Ground
Before a single pile is driven we map water, wind and the species already living on the plot. The masterplan bends around them.
02 Rise
Mass-timber cores and triple-glazed skins go up in weeks, not years — prefabricated within 80 km of the site.
03 Bloom
Terraces, facade troughs and roof meadows are engineered into the structure from day one, irrigated by rain the building catches itself.
04 Dusk
When the light goes, the gardens keep cooling the streets and the windows come on one by one. This is what we hand over: a neighbourhood, already alive.
Built & building
Each place is different. The rule is the same: the garden is part of the structure, not added at the end.
Harbourfront · 14 towers
A former container wharf turned into fourteen glass-and-timber towers stepping down to the water, linked by planted bridges.
Hillside · 1 tower, 61 floors
The tallest timber-hybrid in the region, wrapped in nine sky gardens that residents tend together, one every seven floors.
Former rail yard · 22 low-rises
Twenty-two low-rise blocks around a restored meadow, with car-free streets and a school that opens onto the wildflowers.
Principles
Four rules we do not negotiate on, written into every contract we sign.
40%
Planting is drawn before floor plans. Forty per cent of every plot stays open soil.
90%
Roof meadows and cisterns hold nine-tenths of rainfall on site and feed the facade gardens.
−62%
Mass timber stores carbon instead of emitting it: embodied CO₂ is down 62% against concrete.
80 km
Eighty per cent of components are made within 80 km of the site, by people who live there.
Impact, audited yearly
Process
Five steps, roughly three years, and a decade of looking after what we planted.
Six months of site ecology surveys and resident workshops before any drawing.
A masterplan drawn around existing trees, water flows and prevailing wind.
Timber cassettes and planters built off-site, within 80 km.
Structure and skin in under twenty weeks per tower, with almost no site waste.
We stay on as gardeners for ten years, then hand the tools to residents.
Contact
Partnering on a plot, a policy or a pilot? Our team answers every message within two working days.